[1]
de Santana, I., B. Martins, A., Lago, E. and Estolano, A. 2025. Risk Management Assessment During Maintenance Shutdown of a Water-Tube Boiler in a Petroleum Refinery: A Case Study. Journal of Engineering and Applied Research. 10, 2 (May 2025), 17-26. DOI:https://doi.org/10.25286/repa.v10i2.3159.